Free printable template

Menu Engineering Worksheet

Put every dish on one sheet with how many you sold and how much each one earns, and see which to promote, reprice, rework or remove. The method is the classic Kasavana–Smith menu engineering matrix.

Menu Engineering Worksheet

Venue: ________ Period: ________ Total items sold: ________

Menu itemItems soldMenu mix %Selling price (net)Food costContribution marginTotal marginPopularity H/LMargin H/LClass
Beef burger12012.0%£15.50£4.65£10.85£1,302.00HLPlowhorse
Ribeye 300 g606.0%£29.00£11.60£17.40£1,044.00HHStar
Sea bass fillet252.5%£24.00£8.40£15.60£390.00LHPuzzle
Mushroom risotto202.0%£14.00£3.90£10.10£202.00LLDog

Example filled in — the PDF and Excel download blank, with more rows and the header repeated on every page.

What to write in each column

Menu item
One dish per line, as it appears on the menu. Analyse one section at a time.
Items sold
Portions sold in the period, from the till's product sales report.
Menu mix %
Items sold ÷ total items sold in the section × 100. In the example the section has 20 dishes and 1,000 items sold.
Selling price (net)
Menu price excluding VAT (and any service charge). Using the price with VAT inflates every margin.
Food cost
The cost of the ingredients for one portion, from the recipe card at current supplier prices.
Contribution margin
Selling price − food cost: what each plate leaves you to pay staff, rent and profit.
Total margin
Contribution margin × items sold. Add the column up; total margin ÷ total items sold = average margin (£11.20 in the example).
Popularity H/L
H if the menu mix % is at least 70% of an equal share (here 3.5%), otherwise L.
Margin H/L
H if the contribution margin is at least the average margin (here £11.20), otherwise L.
Class
Star (H/H), Plowhorse (H popularity, L margin), Puzzle (L popularity, H margin), Dog (L/L).

How often, who fills it in and signs it

The owner or head chef fills it in with the till report and recipe cards, ideally together, since one knows prices and the other knows costs. Do it before every menu change and at least once a season, using at least 4 weeks of sales. Act on the result: move Stars to the best spot on the menu, re-cost or nudge up Plowhorses, describe or recommend Puzzles, and replace Dogs unless they have a reason to stay (the only vegan main, for example).

How to use it

  1. Pick one menu section (mains, starters) and a period of at least 4 weeks, and take the items sold per dish from your till report.
  2. For each dish write the price excluding VAT and the food cost from its recipe card; contribution margin = price − food cost, total margin = margin × items sold.
  3. Popularity is high if a dish's menu mix is at least 70% of an equal share (with 20 dishes: 0.7 × 5% = 3.5%). Margin is high if it's at least the average margin (total margin ÷ total items sold).
  4. Classify: Star (high/high) keep and feature; Plowhorse (popular, low margin) reprice or re-cost; Puzzle (profitable, not popular) reposition or rename; Dog (low/low) rework or remove.

Common mistakes

  • Using prices including VAT, which makes every dish look more profitable than it is.
  • Using food costs from a recipe card written two years ago, before supplier prices went up.
  • Comparing starters against mains in the same table: they have different prices and volumes.
  • Removing every Dog automatically, including the dish that brings in a group's only vegetarian.

Frequently asked questions

What is menu engineering?

A method that classifies each dish by popularity and by contribution margin (price minus food cost), so you decide with numbers which dishes to promote, reprice, rework or drop. It was published by Kasavana and Smith in 1982 and is still the standard.

Why the 70% rule for popularity?

If every dish sold equally, each would have 1 ÷ number of dishes of the sales. The method counts a dish as popular if it reaches at least 70% of that share, so a menu doesn't end up with half its dishes labelled 'unpopular'.

Should I use food cost percentage or margin?

Margin in money. A steak at 40% food cost can earn more per plate than pasta at 20%. You pay wages with money, not percentages.

How often should I do menu engineering?

Every time you change the menu and at least every season, using sales from the same period. Compare sections separately: mains against mains, desserts against desserts.

Related templates

Other free templates